20 April 2012




Water & Light Test







Evening water test.


The LED lights.

 The water pump.


 Setting up the water pump.

 Moving Panel A for the water and light test.


Panel B.


Panel A reproduced. 




17 April 2012

Concrete

The finished silicon mould of the art was taken to the concrete specialists. They build a frame around the artwork element to create one complete panel - ready to install on site, than fill the mould with glass reinforced colour concrete. Once the concrete is set the mould is removed and is ready for the next one. The art panel now needs time to cure (a prosses of drying during which it would change colour untill fully set).











Silicon

After the artwork was finished and prepared for the mould to be taken Paul Piccolini from Piccolini Creations http://piccoli.tradingmania.com/ build a frame around the clay art work and than made the silicon model.
A reverse image of the artwork.

A board and wax to keep the silicon from loosing shape.



Peeling off the silicon mould from the clay artwork.